PROJECTS PORTFOLIO

On-Going Projects

Projects: Projects
1project.jpg

2-STOREY VILLA IN GALALI AREA

•  Lean concrete for foundation and grade beam.
•  Construct concrete foundation grade beam, columns.
•  Concreting of floor slab.
•  Supply and install ceramic tiles.
•  Supply and install concrete block for wall and partition.
•  Plastering works for wall and ceiling.
•  Supply and install gypsum partition and gypsum ceiling.
•  Supply and apply paint for wall and ceiling.
•  Construct car parking.
•  Supply and install pre cast paving blocks
•  Supply and install water proofing at the roof top and   bathroom.

Projects: Projects

PROJECTS PORTFOLIO

At BPH & ARK International Contracting W.L.L., we help individuals and businesses with our top of the line services. Since starting out, we’ve taken on a variety of projects, always providing personalized attention to ensure precision and satisfaction with all of our work. Take a look at our recent projects and get in touch today to start your own.

2.jpg
house-design-architect-drawings-project-

CARREFOUR HYPERMARKET IN BAHRAIN CITY

​

CIVIL/ARCHITECTURAL FIT OUT WORKS

March 20,2008 - September 16,2008

PROJECT DESCRIPTION
•Concreting of slab in sales area, CCO, security office, cold room & trench.
•Supply & install of ceramic tiles and grouting in sales area, cold room and toilet.
•Fabricate & installation of bulkhead in sales area.
•Construct concrete foundation for standby generator.
•Construct concrete partition in first floor.
•Supply & installation of expansion joint.
•Supply & installation of gypsum partition for offices
•Supply & installation of ceiling such as tiles ceiling, gypsum ceiling and open shield ceiling.
•Supply & apply primer putty & paint RAL 9010 at sales area, bulk head, offices & ceiling.
•Supply & install PVC tiles in all offices.
•Supply & apply epoxy paint in cold room, electrical room.
•Supply & installation of 2hours fire rated industrial shutter door, electrically and manually operated.
•Supply & installation of wooden doors, metal doors, aluminum doors with complete accessories.
•Supply & installation chub audio pay station and pay trough and hopper cash transfer unit in CCO.
•Supply & installation of security bookroom door in CCO.
•Fabrication & installation of steel platform for R.O. unit receiving area & maintenance office.
•Fabrication & installation of stainless steel barrier in sales area.
•Fabrication & installation of condenser platform in roof top.
•Coring of slab for sewer line.

construction-site-000058264804_Large.jpg

FIT OUT WORKS / DAMMAM K.S.A

CARREFOUR HYPERMARKET IN SHATEA MALL

March 2009 - September 2009

PROJECT DESCRIPTION
•Concrete screening of floor slab
•Coring of slab for sewer line and water line
•Supply and install water proofing at fisheries, cold room and butchery area
•Supply and install HVAC system
•Supply and install firefighting system.
•Supply and install CCTV.
•Supply and install plumbing system.
•Supply and install PPR water line.
•Supply and install gypsum partition and gypsum ceiling.
•Supply and install glass partition and glass flooring.
•Supply and apply paint for wall and ceiling.

4.jpg
lmi-safety.png

ANDALUS PLAZA

​

ANDALUS PLAZA PROJECT DAMMAM K.S.A

March 2009 - August 30,2009

PROJECTS DESCRIPTION

•Lean concrete for foundation and grade beam.

•Construct concrete foundation grade beam, columns.

•Concreting of floor slab.

•Supply and install ceramic tiles.

•Supply and install concrete block for wall and partition.

•Plastering works for wall and ceiling.

•Supply and install gypsum partition and gypsum ceiling.

•Supply and apply paint for wall and ceiling.

•Construct car parking.

•Supply and install pre cast paving blocks

•Supply and install water proofing at the roof top and bathroom.

3.jpg

PROJECTS PORTFOLIO

Completed Projects

Projects: Projects
clients.png

CONSTRUCTION OF SUNSHELTER

RIFFA WIVS COMPANY

September 2,2008 - January 5, 2009

PROJECT DESCRIPTION


•Construct concrete foundation

•Concreating of floor slab.

•Fabrication & installation of structural steel such as steel column steel trusses & purlins.

•Painting of steel structure.

•Supply & installation of corrugated sheet for roofing.

•Supply & installation of fiber glass insulation.

CONSTRUCTION OF 20 CAR PARKING SHADE

BADER VILLA IN SEHLA

January 30,2009 - March 7,2009

PROJECT DESCRIPTION


•Construct concrete foundation.

•Fabrication and installation of steel structure.

•Painting of steel structure.

•Supply & installation of roofing sheet.

CONSTRUCTION OF SUNSHELTER

FISHING FACTORY IN SITRA

March 10,2009 - April 7,2009

PROJECT DESCRIPTION


  • Supply & installation of corrugated sheet for roofing

  • Supply & installation of fiber glass installation.

  • Painting of steel structure.

HOTEL PROJECT AL KHOBAR K.S.A

MANAFEA HOTEL

March 2009 - June 25,2009

PROJECT DESCRIPTION


•Lean concrete for foundation and grade beam.

•Construct concrete foundation grade beam, columns.

•Concreting of floor slab.

•Supply and install ceramic tiles.

•Supply and install concrete block for wall and partition.

•Plastering works for wall and ceiling.

•Supply and install gypsum partition and gypsum ceiling.

•Supply and apply paint for wall and ceiling.

•Construct car parking.

Supply and install pre cast paving blocks

PROJECTS PORTFOLIO

Completed Projects

Projects: Projects
clients.png

CONTRUCTION OF 13.8KV SUB STATION

NOFA RIYADH K.S.A

April 2,2009 - June 25,2009

PROJECT DESCRIPTION

​

•Construct concrete foundation for transformer and RMU.

•Supply and install perimeter fence for substation.

•Supply and install transformer and RMU.

•Supply and lay cable including termination.

•Testing and commissioning of transformer and RMU.

HOTEL FIT OUT WORKS IN AL JUBAIL

ALOHILY JUBAIL K.S.A

September 4,2010

PROJECT DESCRIPTION


•Supply and apply Emulsion paint

•Supply and install floor tiles and wall tiles.

•Supply and install water proofing.

•Supply and install CPVC pipe for cold and hot water line

•Supply and install for sewer line.

CIVIL / ARCHITECTURAL FIT OUT WORKS

PANDA HYPERMARKET UM AL HASSAM RIYAD K.S.A

March 1,2010 - July 25,2010

PROJECT DESCRIPTION

​

•Concreting of slab in sales area, CCO, security office, cold room & trench.

•Supply & install of ceramic tiles and grouting in sales area, cold room and toilet.

•Fabricate & installation of bulkhead in sales area.

•Construct concrete foundation for standby generator.

•Construct concrete partition in first floor.

•Supply & installation of expansion joint.

•Supply & installation of gypsum partition for offices

•Supply & installation of ceiling such as tiles ceiling, gypsum ceiling and open shield ceiling.

•Supply & apply primer putty & paint RAL 9010 at sales area, bulk head, offices & ceiling.

•Supply & install PVC tiles in all offices.

•Supply & apply epoxy paint in cold room, electrical room.

•Supply & installation of 2hours fire rated industrial shutter door, electrically and manually operated.

•Supply & installation of wooden doors, metal doors, aluminum doors with complete accessories.

•Supply & installation chub audio pay station and pay trough and hopper cash transfer unit in CCO.

•Supply & installation of security bookroom door in CCO.

•Fabrication & installation of steel platform for R.O. unit receiving area & maintenance office.

•Fabrication & installation of stainless steel barrier in sales area.

• Fabrication & installation of condenser platform in roof top.

•Coring of slab for sewer line.

Love what you see? Call us today and get an estimate for your next project.